Bathtub removal/new shower stall installation
This project was interesting due to the radically warped framing members which required 'sistering' of all existing studs/joists to plumb walls and floor. Drain was also relocated to center of new stall while maintaining existing tile floor border.

July 12th, 2007 | permalink

Home | subscribe | admin